Crockett Elementary School

Crockett Elementary School included the master plan and design of a new school facility on the location of the existing school grounds and the renovation of the existing Gymnasium. Once this work is completed, the existing facilities will be demolished and the site work (play ground/parking) will be completed.

The new facility is a two-story reinforced concrete frame and pier-suspended reinforced concrete foundation. The exterior finishes are masonry veneer, operable aluminum windows and standing seam metal roofing. Included within the new complex are 52 classrooms (early-childhood classrooms thru fifth grade classrooms), Art, Computer, Science, Kitchen with a Loading Dock, Cafeteria seating area with a performance platform, Library and Administration Offices. New air-cool chillers will replace the existing water cool tower. Complete new mechanical and electrical infrastructure was provided for the school.

Citation Award; San Antonio Chapter of the AIA, 2008
Owner: San Antonio ISD Completion Date: 2006-08-01 Location: San Antonio, Texas Construction Cost: $11.5 Million Size: Renovation - 8,138 SF / New Construction - 98,715 SF Scope: Expansion and Renovation Services: Full service architectural and interior design services Architect: Benito Polendo, AIA Designer: Jerry Sparks, AIA Manager: Ed Carleton, AIA Responsibility: Prime Professional Consultants: MEP Engineer - HMG & Associates, Inc.; Civil Engineer - GGC Engineers, Inc.; Structural Engineer - Lundy&Franke Engineering; Landscape Architect - Laffoon Associates; Food Service - Robert Simpson & Associates Contractor: G.W. Mitchell & Sons - Bill Mitchell - President - 210.227.8127